|
|
|
| OPS 460 -- DESIGNING AND IMPROVING OPERATIONS (4) Prereq: OPS 360. Examines project planning and the design of integrated, lean manufacturing systems. Covers critical path method (CPM), program evaluation and review technique (PERT), production systems, process and capacity analysis, value stream mapping, facility layout and location, and cellular manufacturing. |
|
|